Construction of revetment on the right Kupa River bank in Brođani nearj Karlovac in the length of cca 285 m

EIA procedure was finished for overall Flood protection system of Central Posavina, part of which is this particular Construction and Decision on acceptabillity for environment Class: UP/I-351-03/07-02/54, Reg. No: 531-08-1-1-2-6-08-11 was issued by Ministry of environmental protection, phisically planning and construction  on 20 May 2008. The Decision is part of location permit issued on 23 March 2012.